Saturday, 3 November 2018

Sample Assignments


Assignment ( sample ) of site visit report by ABCM1 ....4A...Sept 2021
 

























Assignment ( sample ) of Hanger report by ABCM1 ....4A...Sept 2021





































Assignment of elective : sample audio video 




















































Assignment for Teaching Assistant's (PG program) : Odd 

Semester 2020

Assignment 1: date of submission 31 Aug 2020 by 0900 hrs…total marks 20

a.       a. Report on lesson plan/course outcomes/delivery/rubric

     b. Research problem/aim/objective/methodology

     c. Improvement of teaching tools

Assignments for 2nd year "A section" Structural system 

and design 2 odd semester 2020

Assignment 8 :  Date and Time of submission 28 Sept 2020 by 2359 hrs…total marks 10

a.       Classification of Cable structures (Draw tree/ network diagram explaining classification of Cable structures)

b.       Images and description of different examples of cable structures.

c.       Make Physical model of Cable structure with whatever available material at home (document the process of making with finished product image) plus virtual model of cable structure to understand forces. (clearly showing tensile and compressive forces.).

 KINDLY AVOID PLAGIARISM…………STRICT ACTION WILL BE TAKEN IF FOUND CHEATING


Assignment 6 :  Date and Time of submission 13 Sept 2020 by 2359 hrs…total marks 10

a.       Classification of Tensile structures (Draw tree/ network diagram explaining classification of Tensile structures)

b.       Images and description of different examples of Tensile structures.

Improvement Submission: Date and Time of submission 12 Sept 2020 by 2000hrs ….No upgradation will be entertained after  closing time of Improved submission. (Mid Term Submission)

c.       Make Improvement in Physical model of Dome with whatever available material at home (document the process of making with finished product image) plus second model of dome of paper strips to understand forces. (clearly show two image one when loaded second unloaded).


Assignment 5:  date of submission 05 Sept 2020 by 2359 hrs…total marks 20

a.       a. Classification of Domes (Draw tree/ network diagram explaining classification of Domes based on geometry/material/techniques/based on shape)

b.       b. Images and description of different examples of domes, especially double dome/triple dome

c.      c.  Make Physical model of Dome with whatever available material at home (document the process of making with finished product image) plus second model of dome of paper strips to understand forces. (clearly show two image one when loaded second unloaded.

d.       d. Label parts of domes on images, clearly identifying parts.

e.      e.  Diagram depicting structural behavior of masonry dome.


Assignment 4:  date of submission 29 Aug 2020 by 1900 hrs…total marks 20

a.       a.         Classification of vaults ( Draw tree/ network diagram explaining classification of vaults based on geometry/material/techniques /based on shape)

b.    b.        Images and description of different examples of vaults

c.       c.      Make virtual model “3D model” of type of common vaults like…barrel/cross/ribbed/fan/cloister

d.     d.        Solve small numerical ….calculate end reactions at support A and E…loading at  B (roll no as per gp1 and gp3) ……loading at D(roll no as per gp2 and gp4)



Assignment 3: date of submission 22 Aug 2020 by 1900 hrs…total marks 20

a.    a.   Classification of arches ( draw tree/ network diagram explaining classification of arches)

b.       b.   Type of arches based on shape….with images…..single centre/two centre/multi centre….

c.      c.      Label the arch on any image and explain each label in detail.

d.       d.     Solve small numerical ….calculate end reactions at support A and B



Assignments for 4th year dissertation students odd 

semester 2020 



Assignment no 1 : date of submission 26 Aug by 0900 hrs 

Poster Presentation: Research Question and Research Design Progressive assessment: panel of two guides (5 marks) 

Sample posters submitted













Assignment for 2nd year students ( mixed program)  for 

elective odd semester 2020 : Real Estate Development


Assignment 5: Date and timing of submission 22 Sept 2020 by 2359 hrs………total marks 10 :

Make two column report covering aspects mentioned below and covered in the class …:

a.       Explain Ownership/free hold/lease hold/PoA/SPoA/Encumbrances/Conveyance Deed related to property.

b.       Explain in details

1.       Sample of registered Power of attorney related to real estate explaining all clauses.

2.       Sample of registered special power of attorney agreement for renting of commercial property more than 12 months assume date of execution as submission date.

KINDLY AVOID PLAGIARISM…………STRICT ACTION WILL BE TAKEN IF FOUND CHEATING



MID TERM SUBMISSION

Assignment 4: Date and timing of submission 15ept 2020 by 2359 hrs………total marks 10 :

Make two column report covering aspects mentioned below and covered in the class …:

a.       Explain Title frauds and type of frauds in purchase of property.

b.       Explain in details

1.       Sample Lease agreement for renting of residential property less than 11 months.

2.      Sample lease agreement for renting of commercial property more than 12 months.

Improvement submission: Date and timing of submission 13 Sept 2000 hrs …..No upgradation will be entertained after  closing time of Improved submission.

KINDLY AVOID PLAGIARISM…………STRICT ACTION WILL BE TAKEN IF FOUND CHEATING



Assignment 3: Date of submission 08 Sept 2020 by 2359 hrs………total marks 15

Make two column report covering aspects mentioned below and covered in the class …:

a.       Explain process for purchase of ready to move property and document to check involved in it.

b.       Explain process for purchase of under construction property and documentation involved in it.

c.       Explain process for purchase of plots and documentation involved in it.

d.       Explain in details

1.       Encumbrances along with Sample of encumbrances certificate form 15 and non-encumbrance certificate Form 16

2.        Sale deed along with sample of sale deed

3.       Things to look in builder buyer agreement along with sample of builder –buyer agreement

4.       Images of online search of property…..example : e-search in delhi/ e-search mumbai


Assignment 2: date of submission 01 Sept 2020 by 1900 hrs………total marks 10

Make two column report covering aspects mentioned below and covered in class …explain with plan downloaded from brochure of developer /builders where ever required:

a.       Explain Carpet Area / Built up area/Super built up area (use plans from any developer brochures or use plan of your own society/apartments) FSI/FAR and TDR

b.       Calculate Carpet area of your own home and percentage of BUA to CA

c.       Images of elements not included in your CA of home calculations??? balcony/ terraces/ service shafts/ common staircases / external walls/recesses



Assignment 1: date of submission 25 Aug 2020 by 1900 hrs…total marks 10

Make two column report covering aspects mentioned below and covered in class …explain with diagrams/network trees where ever required:

a.   a.  Definitions of real estate/property/land/ownership/lease/rental……different association  active in india in RED…different consultancy company’s players in RED

b.     b.  Draw network diagram of Different sub sectors in Real estate development …. residential /commercial /industrial/land………..cover SEZ’z/FDI/CBD/SBD

c.     c. Real estate administrative model explaining all stakeholders.





ASS
IGNMENTS FOR 4th Year & 5th Year /Semester 8 and

10/ Elective/Construction  Management


Eighth Assignment ..... (Audio-PPT -Viva on assigned topic)
Individual submission date...14 Apr 2020...2359 hrs




                                                        Click on top to view video


Seventh Assignment ..... (Portfolio of Contract Management)
Individual submission date...07 Apr 2020...2359 hrs



Sixth Assignment ..... (Consultancy Agreement of Architectural Firm for Construction of extension block of SSAA)
Individual submission date...27 Mar 2020...2359 hrs for 5th Year
                                                 30 Mar 2020...2359 hrs for 4th Year


Fifth Assignment ..... (NIT and PQ documents for Construction of Extension block of SSAA)
Individual submission date...17 Mar 2020...2359 hrs .....



ASSIGNMENTS FOR 3rd Year /Semester 6/ BC /

Construction Documents



Submission 5
Dear Students,

With regard to remedial submission for low performing students  in Internal End Term construction drawings ..... follow the link below to upload your assignment by 06 May, 2020, at 1200 hrs. Thereafter the link will stop collecting the assignments.

Refer Glaring mistake as discussed on 03 May  in on-line interaction on google meet  and also as posted in  CL6 label.



Submission 4

Dear Students,

With regard to submission for Improvement in Internal End Term construction drawings ..... follow the link below to upload your assignment by 01 May, 2020, at 0800 hrs. Thereafter the link will stop collecting the assignments.

Refer common errors as discussed on 24th Apr on-line interaction  and also as posted in  CL6 label.



Submission 3
Dear Students,

With regard to submission for Final Internal End Term construction drawings ..... follow the link below to upload your assignment by 24th April, 2020, at 0700 hrs. Thereafter the link will stop collecting the assignments.

Refer checklist for each deliverable mentioned in CL6 label...do include levels of slab, sunken slab,staircase levels in sections, make sure ground level is marked in each building section...cut sections must be through staircase.projections,courtyard and toilet.....also view reference drawings and sketches.



Submission 2
Dear students,

Deliverable for  03 Apr 2020 to be discussed in the online interaction are as under:
      a.Basement drainage plan with pumping room
      b. two spot sections one through khurra and one through machine room
      c. Toilet layouts
      d. Terrace plan with machine room



Refer checklist for each deliverable mentioned in CL6 label...do include levels of slab, sunken slab,staircase levels in sections, make sure ground level is marked in each building section...cut sections must be through staircase.projections,courtyard and toilet.....

Submission 1
Dear Students,

With regard to submission for Improvement in construction drawings..... follow the link below to upload your assignment by 20th March, 2020, at 0700 hrs. Thereafter the link will stop collecting the assignments.

https://docs.google.com/forms/d/1c93au2S4Z7S3qR0Dm-kTbpEwLSMicCEFXG2_3slddgY

The file nomenclature should be like
FirstName.LastName.BC.1.3.pdf or
For this improvement the maximum file size is 01 MB ensure that the file is within this limit. Maximum number of files 10MB
MID TERM IMPROVEMENT
BC Third Year 3C . Even semester . Mid Term.Improvement
Submission of work for Improvement


ASSIGNMENTS FOR 1st Year /Semester 2/ Structural System and Design

Thirteenth Assignment SSD1....1B (Audio-PPT-Viva on assigned topic)
Individual submission date......20Apr 2020....2359hrs

Sample audio-ppt Emailed on Class id and also on TCS digital learning website.....




Click on top to view video

Twelfth Assignment SSD1.....1B (Numerical on Masonry Brick Wall)
Individual submission date...13 Apr 2020...2359 hrs

Eleventh Assignment SSD1.....1B (Numerical on Masonry Brick Pillar)
Individual submission date...06 Apr 2020...2359 hrs





Tenth Assignment SSD1.....1B (report on Masonry)
Individual submission date...28 Mar 2020...2359 hrs
Type of Masonry Units
Type of Mortar
Type of Walls
columns/Piers/Buttress
Prism Test
Confined Masonry
Refer SP20 and IS 1905




Eighth and Ninth Assignment SSD1.....1B (report on Type of soil)
Individual submission date...21 Mar 2020...2359 hrs
Refer SP32 and IS 1498
Type of soils....Failures in soil...
and foundation numerical




Seventh Assignment SSD1.....1B (report on foundations)
Individual submission date...09 Mar 2020...2359 hrs
Covering foundations topic as covered in the class….
Indian codes related to foundations...
Purpose of foundations
Types of foundations
type of failures in foundations
Rules for foundation on sloping sites.....
...also add images (especially brick foundations)  from construction site you had visited undertaking foundation work


Sixth Assignment SSD1.....1B (report on steps on design of timber solid beam and timber solid column)
Individual submission date...02 Mar 2020...2359 hrs
Cover any three timber spices ,one from each group tabulating all data like bending , compressive, shear stresses.......parallel or perpendicular to grain...inside location/outside location /wet location
also cover type of timber beams and type of timber columns.....
steps for designing of solid timber column...
steps for designing of solid timber beam.....


Fifth Assignment SSD1.....1B (report on timber codes)
second group submission date...24 Feb 2020...2359 hrs
Cover relevant codes for structural timber, ......type of classification of structural timber according to strength characteristics,durability,treat ability.....suitability and grouping of timber based on grading...choice....grouping based on MOE and fc/ft.......factors affecting strength of timber...on prohibited defects....permissible defects.....moisture content in timbers based on different zones of RH....types of joints used in timber....type of glues....
types of wooden/timber derivatives....

(Answers for  report on timber codes  see presentation slides under  label SL7 ) 


Fourth Assignment SSD1.....1B (slab loading calculations)
Submission date...17 Feb 2020...2359 hrs
Given....slab thickness...150mm....beam sizes...300 mm x 600 mm......LL=3kn/m2
FF=1kn/m2......factor of safety 1.5
roll no 1 to 10 = span 5m.....density of concrete 25kn/m3
roll no 11 to 22= span 4m....density of concrete 20 kn/m3
roll no 23 to 29= span 6m....density of concrete 30 kn/m3
roll no 30 to 40= span 4m....density of concrete 25 kn/m3
assume what ever is not given...calculate loads on colum A,B,C,D......

(Answers for one slab loading calculations see under label SL7 at end of slides) 







Third Assignment SSD1....1B (Balk active system plus MOI Experiment two column report) ......group submission ......date 10 Feb 2020.....2359 hrs
cover bulk active system/bending moment/shear force/bending stress...moment of resistance/shear stress/deflection...modulus of rigidity/supports/columns/beams/slabs/grids/ portal frames....

Second Assignment SSD-1.....1B (Shear Force Diagrams)....28 Jan 2020
Submission Date 03 Feb2020...... 2359 hrs
.........draw BM diagrams of previous ten questions....
.........clearly show contra-flexure point wherever exist in BM diagram
...show its distance from any one support....
.....calculate BM diagram based on Area on SF diagram explained in the class for Q6 only....

(Answers for BM diagram see under label SL7 at end of slides) 

First Assignment SSD-1.....1B (Shear Force Diagrams)....21 Jan 2020
Submission Date 27 Jan2020...... 2359hrs


First Assignment SSD-1.....1B (Shear Force Diagrams).Answers...28 Jan 2020













Slab Loading and Column loading distribution : 2nd year SSD 2A & 2C













SF Assignment : 2nd Year SSD 2A&2C 










BM assignment : 2nd Year SSD 2018 Batch



















Material report : Brick/Cement/Concrete/Sand/Aggregate/Water/Steel

















Prestress Report: 






















No comments:

Post a Comment