Assignment for Teaching Assistant's (PG program) : OddSemester 2020Assignment 1: date of submission 31 Aug 2020 by 0900 hrs…total marks 20 a. a. Report on lesson plan/course outcomes/delivery/rubric b. Research problem/aim/objective/methodology c. Improvement of teaching tools Assignments for 2nd year "A section" Structural systemand design 2 odd semester 2020Assignment 8 : Date and Time of submission 28 Sept 2020 by
2359 hrs…total marks 10 a.
Classification of Cable structures (Draw tree/
network diagram explaining classification of Cable structures) b.
Images and description of different examples of cable
structures. c.
Make Physical model of Cable structure with
whatever available material at home (document the process of making with
finished product image) plus virtual model of cable structure to understand
forces. (clearly showing tensile and compressive forces.). Assignment 6 : Date and Time of submission 13 Sept 2020 by 2359 hrs…total marks 10 a.
Classification of Tensile structures (Draw tree/
network diagram explaining classification of Tensile structures) b.
Images and description of different examples of Tensile
structures. Improvement Submission:
Date and Time of submission 12 Sept 2020 by 2000hrs ….No upgradation will be
entertained after closing time of
Improved submission. (Mid Term Submission)
c.
Make Improvement in Physical model of Dome with
whatever available material at home (document the process of making with
finished product image) plus second model of dome of paper strips to understand
forces. (clearly show two image one when loaded second unloaded). Assignment 5: date of submission 05 Sept 2020 by 2359 hrs…total marks 20 a. a. Classification of Domes (Draw tree/ network
diagram explaining classification of Domes based on
geometry/material/techniques/based on shape) b. b. Images and description of different examples of
domes, especially double dome/triple dome c. c. Make Physical model of Dome with whatever
available material at home (document the process of making with finished
product image) plus second model of dome of paper strips to understand forces.
(clearly show two image one when loaded second unloaded. d. d. Label parts of domes on images, clearly
identifying parts.
e. e. Diagram depicting structural behavior of masonry
dome. Assignment 4: date of submission 29 Aug 2020 by 1900 hrs…total marks 20 a. a. Classification of vaults ( Draw tree/ network
diagram explaining classification of vaults based on geometry/material/techniques /based
on shape) b. b. Images and description of different examples of
vaults c. c. Make virtual model “3D model” of type of common
vaults like…barrel/cross/ribbed/fan/cloister
d. d. Solve small numerical ….calculate end reactions at support A and E…loading at B (roll no as per gp1 and gp3) ……loading at D(roll no as per gp2 and gp4) Assignment 3: date of submission 22 Aug 2020 by 1900 hrs…total marks 20 a. a. Classification of arches ( draw tree/ network
diagram explaining classification of arches) b. b. Type of arches based on shape….with
images…..single centre/two centre/multi centre…. c. c. Label the arch on any image and explain each
label in detail. d. d. Solve small numerical ….calculate end reactions at support A and B Assignments for 4th year dissertation students oddsemester 2020Assignment no 1 : date of submission 26 Aug by 0900 hrs Poster Presentation: Research Question and Research
Design
Progressive assessment:
panel of two guides (5 marks) Assignment for 2nd year students ( mixed program) forelective odd semester 2020 : Real Estate DevelopmentAssignment 5: Date and timing of submission 22 Sept 2020 by 2359
hrs………total marks 10 : Make two column report covering
aspects mentioned below and covered in the class …: a. Explain
Ownership/free hold/lease hold/PoA/SPoA/Encumbrances/Conveyance Deed related to
property. b. Explain
in details 1.
Sample of registered Power of attorney related
to real estate explaining all clauses. 2.
Sample of registered special power of attorney
agreement for renting of commercial property more than 12 months assume date of
execution as submission date.
KINDLY AVOID PLAGIARISM…………STRICT ACTION WILL
BE TAKEN IF FOUND CHEATING MID TERM SUBMISSION Assignment 4: Date and timing of submission 15ept 2020 by 2359 hrs………total
marks 10 : Make two column report covering
aspects mentioned below and covered in the class …: a. Explain
Title frauds and type of frauds in purchase of property. b. Explain
in details 1.
Sample Lease agreement for renting of
residential property less than 11 months. 2. Sample
lease agreement for renting of commercial property more than 12 months. Improvement submission:
Date and timing of submission 13 Sept 2000 hrs …..No upgradation will be
entertained after closing time of
Improved submission.
KINDLY AVOID PLAGIARISM…………STRICT ACTION WILL
BE TAKEN IF FOUND CHEATING Assignment 3: Date of submission 08 Sept 2020 by 2359 hrs………total
marks 15 Make two column report covering
aspects mentioned below and covered in the class …: a. Explain
process for purchase of ready to move property and document to check involved
in it. b. Explain
process for purchase of under construction property and documentation involved
in it. c. Explain
process for purchase of plots and documentation involved in it. d. Explain
in details 1.
Encumbrances along with Sample of encumbrances
certificate form 15 and non-encumbrance certificate Form 16 2.
Sale deed
along with sample of sale deed 3.
Things to look in builder buyer agreement along
with sample of builder –buyer agreement
4.
Images of online search of property…..example : e-search
in delhi/ e-search mumbai Assignment 2: date of submission 01 Sept 2020 by 1900 hrs………total
marks 10 Make two column report covering
aspects mentioned below and covered in class …explain with plan downloaded from
brochure of developer /builders where ever required: a. Explain
Carpet Area / Built up area/Super built up area (use plans from any developer
brochures or use plan of your own society/apartments) FSI/FAR and TDR b. Calculate
Carpet area of your own home and percentage of BUA to CA
c. Images
of elements not included in your CA of home calculations??? balcony/ terraces/ service
shafts/ common staircases / external walls/recesses Assignment 1: date of submission 25 Aug 2020 by 1900 hrs…total marks
10 Make two column report covering
aspects mentioned below and covered in class …explain with diagrams/network
trees where ever required: a. a. Definitions
of real estate/property/land/ownership/lease/rental……different association active in india in RED…different consultancy company’s players in RED b. b. Draw
network diagram of Different sub sectors in Real estate development ….
residential /commercial /industrial/land………..cover SEZ’z/FDI/CBD/SBD c. c. Real
estate administrative model explaining all stakeholders. ASSIGNMENTS FOR 4th Year & 5th Year /Semester 8 and 10/ Elective/Construction Management
Eighth Assignment ..... (Audio-PPT -Viva on assigned topic)
Individual submission date...14 Apr 2020...2359 hrs
Click on top to view video
Seventh Assignment ..... (Portfolio of Contract Management)
Individual submission date...07 Apr 2020...2359 hrs
Sixth Assignment ..... (Consultancy Agreement of Architectural Firm for Construction of extension block of SSAA)
Individual submission date...27 Mar 2020...2359 hrs for 5th Year
30 Mar 2020...2359 hrs for 4th Year
Fifth Assignment ..... (NIT and PQ documents for Construction of Extension block of SSAA)
Individual submission date...17 Mar 2020...2359 hrs .....
ASSIGNMENTS FOR 3rd Year /Semester 6/ BC /
Construction Documents Submission 5 Dear Students,
With regard to remedial submission for low performing students in Internal End Term construction drawings ..... follow the link below to upload your assignment by 06 May, 2020, at 1200 hrs. Thereafter the link will stop collecting the assignments.
Refer Glaring mistake as discussed on 03 May in on-line interaction on google meet and also as posted in CL6 label. Submission 4 Dear Students,
With regard to submission for Improvement in Internal End Term construction drawings ..... follow the link below to upload your assignment by 01 May, 2020, at 0800 hrs. Thereafter the link will stop collecting the assignments.
Refer common errors as discussed on 24th Apr on-line interaction and also as posted in CL6 label. Submission 3 Dear Students,
With regard to submission for Final Internal End Term construction drawings ..... follow the link below to upload your assignment by 24th April, 2020, at 0700 hrs. Thereafter the link will stop collecting the assignments.
Refer checklist for each deliverable mentioned in CL6 label...do include levels of slab, sunken slab,staircase levels in sections, make sure ground level is marked in each building section...cut sections must be through staircase.projections,courtyard and toilet.....also view reference drawings and sketches. Submission 2 Dear students, Deliverable for 03 Apr 2020 to be discussed in the online interaction are as under: a.Basement drainage plan with pumping room b. two spot sections one through khurra and one through machine room c. Toilet layouts d. Terrace plan with machine room
Refer checklist for each deliverable mentioned in CL6 label...do include levels of slab, sunken slab,staircase levels in sections, make sure ground level is marked in each building section...cut sections must be through staircase.projections,courtyard and toilet.....
Submission 1 Dear Students,
With regard to submission for Improvement in construction drawings..... follow the link below to upload your assignment by 20th March, 2020, at 0700 hrs. Thereafter the link will stop collecting the assignments.
https://docs.google.com/forms/ The file nomenclature should be like FirstName.LastName.BC.1.3.pdf or For this improvement the maximum file size is 01 MB ensure that the file is within this limit. Maximum number of files 10MB | |
MID TERM IMPROVEMENT | |
BC Third Year 3C . Even semester . Mid Term.Improvement Submission of work for Improvement | |
type of failures in foundations
Rules for foundation on sloping sites.....
No comments:
Post a Comment