ADVANCE BUILDING CONSTRUCTION AND MATERIAL -I
( FOURTH YEAR ODD SEMESTER)
Study material Resource on modular construction :08 Sept 2021 for 4A
Assignment no 1
Dear students
whole class is divided into group of six with six group members in each and are assigned six light house projects under GHTC for research and study systems/ limitations of system under stand assembly details .......according to group number...example gp 1 will study indore projects.
Presentation of each group will start at 1300 hrs on 08 sept 2021.
you can visit following link for detail information
https://ghtc-india.gov.in/
Study material Resource on prestress construction :22 Sept 2021 for 4A
Also refer study material shared under CL3
Site visit report of Flyboy aviation on 15 Sept in group of five
Individual report on research on hangers on 15 sept 2021
MID TERM REVIEW OF HANGER PROJECT ON 27OCT21
IMPORTANT NOTICE
dear students
kindly improve upon drawings and rectify Common mistakes seen in drawings and element missing in submitted drawings
Dimensioning of all
elements/parts missing
Labelling of all elements/parts…like…rafters/purlins/grits/base
plate/ridge cap/gutter/drain pipe/built up members/stiffeners
Composition of sheets
Line weights….why cannot it be in
black and white???why grey where parts are not visible???
Markings of levels in plans/
sections/elevations???
Proper scale in details…no
labelling in details/just blow up single line shown with no dimensioning and
referencing
NGL/PL/and even DPC not reflected
or marked
Materials are not represented
properly…. Hollow /ACC blocks/brick/hatching is shown in sheet roofing???direction
of roofing???
Cross referencing/cross
dimensioning/labelling/detailing
Slopes not shown or marked…
Steps not numbered???even
width/riser/landing not shown
Dotted lines of all overhead elements
missing???
Grid lines not properly marked??
Centre line of members missing???
Joinery of
members/bolted/welded…or pitch of bolts??sizes missing…thickness of members not
mentioned???
Spot sections of each member not
shown???
Height of texts/dimensions not
properly readable
Purlin/grit spacing???joining details?? Extension clip where
ever required missing??
End wall details ???joining details?? Trims at corner?? Fascia
if provided in end wall??flashings missing???
Gutter details??eave piece missing?? Ridge piece??
Overlapping details of roofing??
Hanger door details?? Gantry details not prospering marked??
Wind bracing details???
Pedestal details ???plus plinth beams??foundation details at
annexe building??
Details of members/ precast or lgs or in place in annexes??
TENSILE STRUCTURES : REPORTS submission 10 Nov 21
TENSILE STRUCTURE : CONCEPTS for
a. 20x45
or
b. 30x30
design
LARGE SPAN STADIUMS : Submission 24 Nov 21
IMPORTANT NOTICE:4
Dear Students,
With regard to submission for Final Internal End Term construction drawings ..... follow the link below to upload your assignment by 24th April, 2020, at 0700 hrs. Thereafter the link will stop collecting the assignments.
Refer checklist for each deliverable mentioned in CL6 label...do include levels of slab, sunken slab,staircase levels in sections, make sure ground level is marked in each building section...cut sections must be through staircase.projections,courtyard and toilet.....also view reference drawings and sketches.
join at link below to get feedback on submission at 1500hrs
meet.google.com/age-jzhs-uxc
Dear students,
Deliverable for 03 Apr 2020 to be discussed in the online interaction are as under:
a.Basement drainage plan with pumping room
b. two spot sections one through khurra and one through machine room
c. Toilet layouts
d. Terrace plan with machine room
Refer checklist for each deliverable mentioned in CL6 label...do include levels of slab, sunken slab,staircase levels in sections, make sure ground level is marked in each building section...cut sections must be through staircase.projections,courtyard and toilet.....
IMPORTANT NOTICE :2
Dear Students
In view of Coronavirus situation prevailing in Gurugram, all students of BArch 3rd year , 6 Semester ,Building Construction Subject are instructed to attend Second google meet interaction viva link given below on 27 Mar 2020 at 0930 hrs on Construction Document ......wherein each student will present his drawings in pdf format by clicking on present now button in google meet and will adhere to time limit.
meet.google.com/ywd-xydx-etz
Log in at 0900 hrs for smooth conduct of interaction.........In case we are not able to interact on this
platform due to technical reason....Then we will shift to ZOOM platform... I will send the link accordingly at 0945 hrs
Also go through common mistake being spelled out in the group and be prepared for discussion on drawings especially terrace plan/sections/elevations during live interaction by sharing your work on live platform.
IMPORTANT NOTICE :1
Dear Students
In view of Coronavirus situation prevailing in Gurugram, all students of BArch 3rd year , 6 Semester ,Building Construction Subject are instructed to attend first google meet interaction viva link given below on 20 Mar 2020 at 0930 hrs on Construction Document ......wherein each student will present his drawings in pdf format by clicking on present now button in google meet and will adhere to time limit.
meet.google.com/ywd-xydx-etz
Log in at 0900 hrs for smooth conduct of interaction.........In case we are not able to interact on this
platform due to technical reason....Then we will shift to ZOOM platform... I will send the link accordingly at 0945 hrs
Also go through common mistake being spelled out in the group and be prepared for discussion on drawings during live interaction by sharing your work on live platform.
SKETCHES
Drawings of false ceiling/fire fighting/fire detection/security
RATING ASSIGNMENT